Close Cookie Preference Manager
Cookie Settings
By clicking “Accept All Cookies”, you agree to the storing of cookies on your device to enhance site navigation, analyze site usage and assist in our marketing efforts. More info.
Strictly Necessary (Always Active)
Cookies required to enable basic website functionality.
Made by Flinch 77
Oops! Something went wrong while submitting the form.

Preventive & Predictive Maintenance

PM Development & Optimization Overview

Regardless of the state of your PMs, from start to finish, MVP One is here to help you and your team develop & optimize PMs.
PMs are foundational to increasing asset reliability and achieving Maintenance & Reliability Excellence. Hence, PMs must be evaluated (like a controlled experiment) on a regular basis to determine whether they should be continued, modified, eliminated, or if new ones need to be created.
Sheila Ruby, Supply Chain Analyst
No items found.

Preventive Maintenance Goals

Increase reliability.
Maximize asset life.
Minimize maintenance costs.
Preserve & protect equipment.
Prevent, predict, minimize, or eliminate failures.
Reduce breakdown material costs.

PM Development

Asset Criticality

Determine  asset criticality.

Data Collection

Collect data.

  • Equipment manuals
  • Existing records
  • OEM customer references
  • Plants with similar equipment

PM Strategy

Determine strategy (for each asset) delivering the best financial impact to your organization.

  • Preventive (or Preventative) Maintenance (PM)
  • Predictive Maintenance (PdM)
  • Run to Failure (RTF)

PM Development

Develop PMs to increase reliability.

PM optimization

Validation

Validate data.

  • Asset/PM relationships
  • Asset criticality ranking
  • Asset hierarchy
  • Downtime tracking
  • Work order history

Prioritization

Rank assets.

  • Asset criticality
  • Number & severity of safety incidences
  • Product quality-related issues
  • Total downtime impact
  • Total parts & labor repair costs

Optimization

Optimize strategies.

  • Analyze historical data
  • Identify failure modes
  • Conduct content & financial impact review
  • Finalize optimal PM strategy (PM, PdM, RTF)

Review

Discuss expected outcomes.

  • Efficient utilization of maintenance resources
  • Increased asset uptime, capacity, & life
  • Optimized PM strategy with JIT objective
  • Reduced operational costs

Search

Get In Touch!

Contact MVP One today for more information.

Contact Us